Based on the load, our technician visits the site and evaluates the overall requirements
Load X backup required.
Based on electrical wiring and appliances requirements. We must provide a single phase to phase, 3 phase to single phase, single phase to 3 phase, 3 phase to 3 phase.
Yes, we can do the electrical cabling, switch gear, breaker supply, and installation.
Yes, we do provide AC-DBR kit and DC-DBR kit, based on the UPS.
Yes, we provide a traditional earth system, a chemical earth system based on customer requirements.
To maintain a good neutral, we need an independent earthing system.